Skip to content Skip to footer

Umm Al Nar Refinery Relocation

Summit Engineering FZC successfully delivered end-to-end project management services for the demolition, relocation, and upgrade of the 85,000 barrels per day Umm Al Nar Refinery. The contract was awarded to a UAE based company and Summit Engineering was the Project Management Consultancy for the client
The project encompassed the complete lifecycle, including technical and economic feasibility studies, dismantling and demolition engineering, relocation to Fujairah, and redevelopment into an upgraded hydroskimming refinery with integrated vacuum distillation unit (VDU) capacity. Acting as the overall project management consultant, Summit Engineering developed detailed dismantling methodologies, master schedules, and interface management plans, ensuring safe, environmentally compliant execution and efficient reinstallation in alignment with the client’s objectives in Fujairah.

img-023-copyright-3

2 Comments

  • Post Author
    Bob Brown
    Posted September 3, 2025 at 5:42 pm

    Donec id blandit felis. Aenean placerat sodales commodo. In sed odio at sapien consequat semper ac a elit. Nunc consequat ac tortor quis dignissim. Integer ac commodo elit. Donec finibus cursus tortor, et bibendum turpis interdum non. Nam mattis enim in metus interdum, vel suscipit arcu porttitor. Cras vitae nisi et dui efficitur fringilla ut vitae sapien.

  • Post Author
    Charlie Green
    Posted September 3, 2025 at 5:43 pm

    Quisque at tortor purus. Cras ut molestie risus. Donec non tellus ut elit lacinia dapibus. Suspendisse faucibus ante dui, nec luctus est pretium et. Curabitur et orci non urna ullamcorper sollicitudin quis lacinia arcu. Nunc quam diam, dictum ut nisi quis, venenatis facilisis odio. Nullam nec venenatis neque, nec sagittis dui. Vestibulum aliquet non nisl et gravida.

Leave a Comment